Jucar river bridge

Load tests on a singular bridge.

The Calsens team has carried out static and dynamic load tests on the bridge over the Jucar river on the C-43 road as it passes through Alzira. More than 25 optical strain sensors, accelerometers and topographical techniques were used for real-time control and monitoring of the structure during the course of the tests. The development of these tests arises from the need to verify that, for representative load situations, the behavior of the structure complies with the project forecasts.

CLIENT: BECSA       DATE: NOV.21      LOCATION: ALZIRA

Puente Gata de Gorgos

Instalación de sensores.

El equipo de Calsens ha llevado a cabo la instalación de sensores en el viaducto de Gata de Gorgos para futuras pruebas de carga estáticas y dinámicas, con el objetivo de verificar la adecuada rehabilitación y ejecución del puente, mediante la evaluación de su comportamiento estructural. Para ello se comparará la respuesta real y la esperada, según el modelo de cálculo empleado para su diseño y comprobación.

CLIENTE: UTE FGV LINEA 9 TEULADA-GATA       FECHA: JUL.21      LOCALIZACIÓN: GATA DE GORGOS